Electric Projects
Columbus Drive/Court - This area has existing overhead facilities that are due for replacement. The existing overhead lines will be installed underground. Estimated August-September 2025 start.
Columbus Drive/Court Project Map
South Tamarack Avenue - East 15th Street to East 17th Street. This area has existing overhead facilities that are due for replacement. The existing overhead lines will be installed underground. Estimated August-September 2025 start.
Cty B Overhead Rebuild - Cty H south to Yellowriver Road -- This project is mostly a pole of pole replacement with only a few new spans. Estimated September 2025 start.
Roman Road Overhead Rebuild - Cty E to Galvin Avenue -- This project is a pole for pole rebuild. Estimate July 2025 start.
Cty BB Overhead Reroute - Cty BB at US 10 -- This project with reroute existing overhead facilities along the new Cty BB alignment to US 10. Estimated June 2025 start.
South Washington Avenue 3 phase to 1 phase Overhead Conversion - East 17th Street south to East 29th Street -- New poles will be installed and two phases will be removed. Estimated May 2025 start.
Water Projects:
This year the Water Department has four large water main replacement projects but the schedule as to when these four projects are starting has not been worked out with the City Street Department at this time.
The four projects are as follows:
S. Maple Ave. from E. 17th St. to E. 21st St. and E. 25th St. to E. 29th St. All water main, valves, hydrants, and services will be replaced in these locations. We are starting this project the first week in June with the vacuum excavation of all utilities that cross our water main. We will then start the pipe bursting of the water main and pullling the replacement 8" pvc watermain during the second week of June for the section between 17th and 21st.. From there we will do service replacement. At that point our directional drilling contract should be mobilizing in to do the boring work from 25th to 29th. We believe this work all combined will take about 5 weeks.
N. Apple Ave. from E. Depot St. to E. Arnold St. All water main, valves, hydrants, and water services will be replaced in this block. Schedule to be determind after completion of the S. Maple Ave. Project.
E. Depot St. from N. Apple Ave. to N. Elm Ave. We will be connecting to dead ends in this section with a new 12 inch water main. Schedule to be determind after completion of the S. Maple Ave. Project.
W. Kalsched St. from Veterans Parkway to N. Sawyer Dr. All water main, valves, hydrants, and water services will be replaced at this location as well. Schedule to be determind after completion of the S. Maple Ave. Project.
Lead Service Replacement Project.
Once again, we will be removing a significant amount of lead services. At the moment we are going to be shooting for nearly two hundred utility side services over this construction season. Property owners/customer's that will be affected by this projects will start to be notified over the next month. Currently we are working in the 900 block of South Cherry Ave. and moving southward.